Skip to content
General ConstructionLake ViewPermit issued

New Clock Structure Construction at 1101 W WAVELAND AVE, Lake View

1101 W WAVELAND AVE, Lake View

Winston

Sinra's conciergeOnline now

Planning general construction work near Lake View? I’ll scope it, price it, and line up the right pro.

Reported project cost

$710,000

As declared on the permit filing.

Issued
August 20, 2026
Expires
—
License
—

What was permitted

Homeowners in Lake View can see the costs associated with significant new construction projects. This permit details the installation of a new 19.73-foot tall, 4-sided clock structure at the south end of Gallagher Way, impacting the local streetscape.

This project is actively permitted and was issued on August 20, 2026, with a reported project cost of $710,000. The scope includes electrical work, in-ground lighting, and anchoring to an existing slab, managed by PREFERRED ELECTRICAL CONSTRUCT.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Lake View, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101085307
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionSELF-CERT 2019 CBRC: *STRUCTURAL PEER REVIEW* INSTALL NEW 19.73' H 4-SIDED CLOCK STRUCTURE AT THE SOUTH END OF GALLAGHER WAY. SCOPE INCLUDES ELECTRICAL, IN-GROUND LIGHTING, ANCHORING TO EXISTING SLAB BELOW GRADE AND PAVERS.
Floor / unit—
Estimated cost$710,000
ApprovedJuly 24, 2026
IssuedAugust 20, 2026
Expires—
BBL—
BIN—

Property owner

Triangle Property Holdings LLC

Related searches

new constructionclock structureLake ViewChicagostructuralelectrical$710,000