Temporary Structures at 1300 S Linn White Dr, Chicago
1300 S LINN WHITE DR, Near South Side
What was permitted
A permit for temporary structures was issued for an event at 12th St Beach in Chicago's Near South Side neighborhood. This includes a raised judge platform, a long scenic platform with a lighthouse, audio towers, LED video walls, and tents.
The project cost is estimated at $75,000, with erection planned from June 3 to June 18, 2026. CHICAGO SPECIAL EVENTS MANAGEMENT is the contact for this event-related construction.
Near South Side property owners should be aware of the $75,000 project cost for temporary event structures, highlighting the scale of special events at local beaches.
What it cost
Issued
May 6, 2026
Expires
—
License
—
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by CHICAGO SPECIAL EVENTS MANAGEMENT · 3 permits across 3 areas
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 101082289 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | — |
| Status | ACTIVE |
| Job Description | PERMIT EXPIRES ON 07/06/2026 ERECTION STARTS: 6/3/2026, ERECTION ENDS: 6/18/2026. SELF CERT. CBC 2019. PEER REVIEW. RED BULL SPINOFF EVENT TEMP. STRUCTURES AT 12TH ST BEACH ON 6-13-26. SETUP JUNE 3 AND TAKEDOWN 6-18-26. 1- 20FTX12FT RAISED JUDGE PLATFORM, 1-460FT LONG RAISED PLATFORM WITH 14FT SCENIC LIGHTHOUSE AND BRANDING SIGNS, 2 - 35FT AUDIO TOWERS, 3 LED MOBILE VIDEO WALLS, 2 - 50FT DIA STAR WIGWAM TENT, AND 1- 45FTX20FT VIP TRUCK TENT. OZTECH MEDIA WITH CSEM. |
| Floor / Unit | — |
| Estimated Cost | $75,000 |
| Approved | April 17, 2026 |
| Issued | May 6, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property Owner
OZTECH MEDIA