Skip to content
General ConstructionNear South SidePermit issued

Temporary Structures at 1300 S Linn White Dr, Chicago

1300 S LINN WHITE DR, Near South Side

Winston

Sinra's conciergeOnline now

Planning general construction work near Near South Side? I’ll scope it, price it, and line up the right pro.

Reported project cost

$75,000

As declared on the permit filing.

Issued
May 6, 2026
Expires
—
License
—

What was permitted

A permit for temporary structures was issued for an event at 12th St Beach in Chicago's Near South Side neighborhood. This includes a raised judge platform, a long scenic platform with a lighthouse, audio towers, LED video walls, and tents.

The project cost is estimated at $75,000, with erection planned from June 3 to June 18, 2026. CHICAGO SPECIAL EVENTS MANAGEMENT is the contact for this event-related construction.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Near South Side, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101082289
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionPERMIT EXPIRES ON 07/06/2026 ERECTION STARTS: 6/3/2026, ERECTION ENDS: 6/18/2026. SELF CERT. CBC 2019. PEER REVIEW. RED BULL SPINOFF EVENT TEMP. STRUCTURES AT 12TH ST BEACH ON 6-13-26. SETUP JUNE 3 AND TAKEDOWN 6-18-26. 1- 20FTX12FT RAISED JUDGE PLATFORM, 1-460FT LONG RAISED PLATFORM WITH 14FT SCENIC LIGHTHOUSE AND BRANDING SIGNS, 2 - 35FT AUDIO TOWERS, 3 LED MOBILE VIDEO WALLS, 2 - 50FT DIA STAR WIGWAM TENT, AND 1- 45FTX20FT VIP TRUCK TENT. OZTECH MEDIA WITH CSEM.
Floor / unit—
Estimated cost$75,000
ApprovedApril 17, 2026
IssuedMay 6, 2026
Expires—
BBL—
BIN—

Property owner

Oztech Media

Related searches

temporary structuresNear South SideChicagoevent constructionRed Bull$75,000 - $100,000