What was permitted
This permit covers the erection of seasonal bleachers and grandstands at the Huntington Bank Pavilion for the 2026 concert season. The structures will include a double-decker grandstand, a tip stand bleacher, and a raised deck.
The project has an estimated cost of $50,000 and was issued a permit on May 6, 2026, with construction scheduled from May 4 to October 17, 2026. BRENDAN ELLIS ININPRODUCTION INC is the contact for this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Near South Side, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101082896 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 07/06/2026 ERECTION STARTS: 5/4/2026, ERECTION ENDS: 10/17/2026. SELF CERT - CBC 2019 - PEER REVIEW. 2026 LIVE NATION SEASONAL BLEACHERS AND GRANDSTANDS AT HUNTINGTON BANK PAVILION FOR THE 2026 CONCERT SEASON (SAME SIZE AND LOCATION AS THE 2019-2025 PERMITS) ON MAY 16, 2026 THRU OCT 14, 2026. SETUP IS MAY 4 AND TAKEDOWN IS OCT 17, 2026. 1- 120FT X 43FT DOUBLE- DECKER GRANDSTAND WITH A 120FT X 15FT 5 ROW BLEACHER AND A 55FT X 50FT RAISED DECK AND 1- 115FT X 68FT 20 ROW TIP STAND BLEACHER. LIVE NATION ENTERTAINMENT WITH INPRODUCTION INC. |
| Floor / unit | — |
| Estimated cost | $50,000 |
| Approved | May 1, 2026 |
| Issued | May 6, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
George Berkheimer Live Nation Entertainment
Related searches