What was permitted
Residents near Soldier Field can observe the construction of a temporary stage at 1410 S Museum Campus Dr for an upcoming concert. The project details a large stage complex covering over 20,000 square feet, designed for a major musical event.
This temporary structure includes a main stage, multiple apron and thrust stages, a runway, a front-of-house mix hut, a VIP riser, and tall delay towers. The estimated cost for this temporary stage erection is $35,000, with the permit issued on July 24, 2026, and BRUCE BRONGE INTERNATIONAL CONTRACTORS INC. as the contact.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Near South Side, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101085918 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 09/24/2026 ERECTION STARTS: 7/18/2026, ERECTION ENDS: 7/26/2026. SELF-CERT - CBC 2019 - PEER REVIEW. ERECTION OF TEMPORARY STAGE FOR A KAROL G CONCERT AT SOLDIER FIELD, EVENT DATES JULY 24TH & 25TH 2026 OVERALL AREA: 20,143 SQ.FT., INCLUDING:1.) MAIN STAGE: 9,344 SF2.) TRIANGULAR APRON STAGE: 3,472 SF3.) U-SHAPED THRUST STAGE: 3,619 SF4.) RUNWAY STAGE: 732 SF5.) FRONT OF HOUSE (FOH) MIX HUT: 24FT X 24FT = 576 SF6.) VIP RISER: 20FT X 24FT=480 SF7.) 71FT TALL DELAY TOWERS: 20FT X 24FT = 480 X 2 = 1,920 SF |
| Floor / unit | — |
| Estimated cost | $35,000 |
| Approved | July 14, 2026 |
| Issued | July 24, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Tim Lefevour Legends Global