What was permitted
This permit is for the temporary erection of a mobile stage, measuring 24'x20', for an event called '2026 Black on the Block Stage' at Stadium Green in the Near South Side neighborhood. The permit outlines specific dates for setup and takedown.
The estimated project cost is $3,000, with the permit issued on August 14, 2026, and an active status. SOUNDWORKS PRODUCTION INC is the contact for this event-related construction.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Near South Side, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101087248 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 10/14/2026 ERECTION STARTS: 8/30/2026, ERECTION ENDS: 8/30/2026. CBC 2019 - 2026 BLACK ON THE BLOCK STAGE AT STADIUM GREEN ON AUG 30, 2026. SETUP AND TAKEDOWN ARE AUG 30. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. SOUND WORKS PRODUCTION INC. |
| Floor / unit | — |
| Estimated cost | $3,000 |
| Approved | August 13, 2026 |
| Issued | August 14, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Alainna Edwards Black On The Block
Related searches