1410 S MUSEUM CAMPUS DR, Near South Side
This permit is for the temporary erection of a mobile stage, measuring 24'x20', for an event called '2026 Black on the Block Stage' at Stadium Green in the Near South Side neighborhood. The permit outlines specific dates for setup and takedown.
The estimated project cost is $3,000, with the permit issued on August 14, 2026, and an active status. SOUNDWORKS PRODUCTION INC is the contact for this event-related construction.
Temporary event structures like this stage in the Near South Side can have project costs around $3,000, with quick setup and takedown times.
Issued
August 14, 2026
Expires
—
License
—
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by SOUNDWORKS PRODUCTIONS INC · 1 permits across 1 area
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 101087248 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | — |
| Status | ACTIVE |
| Job Description | PERMIT EXPIRES ON 10/14/2026 ERECTION STARTS: 8/30/2026, ERECTION ENDS: 8/30/2026. CBC 2019 - 2026 BLACK ON THE BLOCK STAGE AT STADIUM GREEN ON AUG 30, 2026. SETUP AND TAKEDOWN ARE AUG 30. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. SOUND WORKS PRODUCTION INC. |
| Floor / Unit | — |
| Estimated Cost | $3,000 |
| Approved | August 13, 2026 |
| Issued | August 14, 2026 |
ALAINNA EDWARDS BLACK ON THE BLOCK
| Expires | — |
| BBL | — |
| BIN | — |