What was permitted
This permit outlines a significant renovation project involving structural peer review, with scope on the first floor including finishes and equipment modifications to an existing weight room and locker room. The second floor will see architectural and structural extension of a cardio mezzanine.
Issued on May 19, 2026, this extensive renovation project has a reported cost of $3,000,000 and was managed by REX ELECT. & TECHNOLOGIES LLC. This provides a high-end cost reference for major structural and interior alterations in the Near West Side.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Near West Side, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101081974 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | SELF-CERT 2019 CBRC: ***STRUCTURAL PEER REVIEW*** FIRST FLOOR SCOPE INCLUDES FINISHES AND EQUIPMENT MODIFICATIONS TO THE EXISTING WEIGHT ROOM (ASSEMBLY) AND RENOVATION OF THE EXISTING LOCKER ROOM. SECOND FLOOR SCOPE INCLUDES THE ARCHITECTURAL AND STRUCTURAL EXTENSION OF THE CARDIO (ASSEMBLY) MEZZANINE INTO A LEVEL 2 FLOORPLATE. NO CHANGE IN EXISTING SEPARATED MIXED A-3/B OCCUPANCIES. NO CHANGE TO EXISTING TYPE IB CONSTRUCTION. |
| Floor / unit | — |
| Estimated cost | $3,000,000 |
| Approved | May 15, 2026 |
| Issued | May 19, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
United Center Joint Venture
Related searches