What was permitted
This permit details a substantial renovation and addition to a mixed-use commercial building near the United Center. The project involves significant changes, including revised parking layouts, elevator additions, and updates to stormwater management and building systems.
Issued on August 21, 2026, this high-rise project has an estimated cost of $800,000 and is being managed by James McHugh Construction Co. It's a complex undertaking involving multiple occupancy groups and Type 1-A construction.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Near West Side, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101082958 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | DDS 2019 CBC. REVISION TO PERMIT #101075067 TO UPDATE THE FOLLOWING: REVISE TO REMOVE ROOFTOP PARK, ADD CURB CUT ON MADISON ST, REVISED PARKING LAYOUT AT LEVEL 1., ADD PARKING GARAGE ELEVATOR VESTIBULE ON EAST SIDE, REVISE ELEVATOR CORE SIZE AND LOCATIONS, REVISE LAYOUT OF TRASH AND RECYCLE ROOMS, REMOVE WEDGE BARRIERS AT TOP OF UC LOADING RAMP, REVISE STORMWATER STRATEGY, UPDATES TO PLUMBING, REVISIONS TO ELECT. AND TECH ROOM LAYOUTS, ADJUSTMENTS TO LANDSCAPE DESIGN. MIXED-USE COMMERCIAL BUILDING ADDITION TO UNITED CENTER AND WILL INCLUDE PARKING, STORAGE, COMMERCIAL LOADING AND RETAIL. THIS PROJECT IS A HIGH-RISE. OCCUPANCY GROUPS A-2, A-3, A-4, B, S-1, AND S-2. TYPE 1-A CONSTRUCTION. CONSULTANT REVIEWER: V3 COMPANIES |
| Floor / unit | — |
| Estimated cost | $800,000 |
| Approved | June 18, 2026 |
| Issued | August 21, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
United Center Joint Venture
Related searches