What was permitted
Homeowners in the Outer Mission neighborhood can see the costs associated with solar installations. This permit covers the mounting of solar panels on a roof, along with a significant 13.5 kWh energy storage unit, including a Tesla backup switch.
This project was issued on July 16, 2026, with an estimated cost of $19,000. Luminalt Energy Corporation is listed as the contractor for this solar upgrade.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Outer Mission, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | S20260622658 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | 2 Family Dwelling |
| Status | issued |
| Job description | solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of ess paired with existing pv system. energy storage system includes: (1) tesla backup switch, (1) tesl |
| Floor / unit | — |
| Estimated cost | $19,000 |
| Approved | July 15, 2026 |
| Issued | July 16, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches