What was permitted
A permit has been issued for the installation of a solar power system and battery storage at 45 Alviso Street in the West of Twin Peaks neighborhood. This project is for a 2-family dwelling.
The permit, issued on August 18, 2026, includes the installation of one 13.5 kWh energy storage unit. The estimated project cost is $17,685, with Nrg Clean Power listed as the contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West of Twin Peaks, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | S20260617656 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | 2 Family Dwelling |
| Status | issued |
| Job description | solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of 1 ess/battery |
| Floor / unit | — |
| Estimated cost | $17,685 |
| Approved | August 7, 2026 |
| Issued | August 18, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches