What was permitted
Homeowners in the West of Twin Peaks area can research the costs associated with installing solar power and battery backup systems. This permit is for a solar installation including one Tesla Powerwall 3 energy storage unit.
Issued on August 28, 2026, the estimated project cost is $16,790. Solar Engineering Llc is the contractor for this electrical system upgrade.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West of Twin Peaks, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | S20260512602 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | 2 Family Dwelling |
| Status | issued |
| Job description | solar permit: ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | battery backup system. install tesla powerwall3, ac disconnect, tesla backup switch |
| Floor / unit | — |
| Estimated cost | $16,790 |
| Approved | August 28, 2026 |
| Issued | August 28, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches