What was permitted
A significant solar energy project is underway at 652 Miramar Av in San Francisco's West of Twin Peaks neighborhood. This permit covers the installation of 22 high-efficiency solar PV modules, totaling 9.9 kW, along with a substantial 13.5 kWh energy storage unit.
This project was completed and issued on April 28, 2026, with an estimated cost of $44,200. The work was handled by Rising Sun Electric.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West of Twin Peaks, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | S20260325523 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | 2 Family Dwelling |
| Status | complete |
| Job description | solar permit: installing 22 solar pv modules, 450 watts per module, total no. of rating 9.9 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installing a 9.9 kw dc |
| Floor / unit | — |
| Estimated cost | $44,200 |
| Approved | April 28, 2026 |
| Issued | April 28, 2026 |