Skip to content
ElectricalGlen ParkPermit issued

Energy Storage System Installation at 23 Laidley St, Glen Park

23 Laidley St, Glen Park, 94131

Winston

Sinra's conciergeOnline now

Planning electrical work near Glen Park? I’ll scope it, price it, and line up the right pro.

Reported project cost

$17,955

As declared on the permit filing.

Issued
September 17, 2026
Expires
—
License
—

What was permitted

Residents in the Glen Park neighborhood can observe the installation of a new energy storage system. This permit specifically covers the installation of a 13.5 kWh Tesla energy storage unit, designed to be paired with existing solar photovoltaic modules.

The permit was issued on September 17, 2026, with an estimated project cost of $17,955. Luminalt Energy Corporation is the contractor responsible for this energy storage system installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Glen Park, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking numberS20260824723
Work permit #—
Job filing number—
Work type—
Statusissued
Job descriptionsolar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of energy storage system only paired with existing pv modules. energy storage system includes: (1) tesla
Floor / unit—
Estimated cost$17,955
ApprovedSeptember 17, 2026
IssuedSeptember 17, 2026
Expires—
BBL—
BIN—

Related searches

energy storage systemTeslaGlen ParkSan Franciscosolar pairing$17,955 project cost