2500 S DAMEN AVE, Lower West Side
For those in the Lower West Side curious about large-scale electrical projects, this permit at 2500 S Damen Ave provides valuable insight. The work includes the installation of two Tesla Megapack Battery Energy Storage Systems (BESS) connected to an existing solar panel system.
This major electrical undertaking has an active permit issued on July 1, 2026, with a substantial reported cost of $2,590,582. The project, managed by CONTINENTAL ELECTRICAL CONSTRU, also involves concrete pad construction and extensive cabling.
A massive electrical project involving Tesla Megapacks at 2500 S Damen Ave in the Lower West Side has an estimated cost of over $2.5 million.
Issued
July 1, 2026
Expires
—
License
—
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by CONTINENTAL ELECTRICAL CONSTRU · 16 permits across 6 areas
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 101075649 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | — |
| Status | ACTIVE |
| Job Description | SPR 2019: ELECTRICAL ONLY: INSTALL 2XL TESLA MEGAPACK BESS AND CONNECT IT TO AN EXISTING PV SYSTEM. THE SCOPE INCLUDES CONCRETE PAD CONSTRUCTION, CONDUIT INSTALLATION, CABLING AND TERMINATIONS AND CONNECTING THE MEGAPACK TO ASSOCIATED ELECTRICAL EQUIPMENT. (OCCUPANCY F, CONSTRUCTION TYPE 1A) PER PLAN **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS ** |
| Floor / Unit | — |
| Estimated Cost | $2,590,582 |
| Approved | October 21, 2025 |
LINAGE LOGISTICS SERVICES LLC
| Issued |
| July 1, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |