SolarWest of Twin PeaksPermit issued

Solar Panel Installation at 33 Robinhood Drive, San Francisco

33 Robinhood Dr, West of Twin Peaks, 94127

Winston

Sinra's conciergeOnline now

Planning solar work near West of Twin Peaks? I’ll scope it, price it, and line up the right pro.

Reported project cost

$85,000

As declared on the permit filing.

Issued
April 29, 2026
Expires
—
License
—

What was permitted

This permit is for the installation of a significant solar photovoltaic (PV) system at a property in the West of Twin Peaks neighborhood. The system includes 35 solar modules totaling 14.7 kW and two energy storage units.

The project was issued on April 29, 2026, with an estimated cost of $85,000. Summit Technology Group Inc. is handling the installation of this solar and energy storage system.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in West of Twin Peaks, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking numberS20251218402
Work permit #—
Job filing number—
Work type—
Statusissued
Job descriptionsolar permit: installing 35 solar pv modules, 420 watts per module, total no. of rating 14.7 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | 1. install 14.7kw photovol
Floor / unit—
Estimated cost$85,000
ApprovedApril 29, 2026
IssuedApril 29, 2026
Expires—
BBL—
BIN—