What was permitted
This permit is for the temporary erection of five significant stage structures for a 2-day event in Chicago's Loop. The largest structure is a substantial stage deck with wings, designed for public assembly.
Issued on April 23, 2026, with a reported cost of $206,000, these structures are scheduled for setup from May 14, 2026, to May 29, 2026. C3 PRESENTS LLC is the contact for this new construction project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101081873 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 06/23/2026 ERECTION STARTS: 5/14/2026, ERECTION ENDS: 5/29/2026. C3 PRESENTS - SUEÑOS 2026 STAGE AND STRUCTURESSTAGE AND STRUCTURES- PEER REVIEW, SELF-CERT, 2 DAY EVENT 5/23/2026-5/24/2026ERECT FIVE (5) STRUCTURES- ONE (1) 79X51X64, STAGE DECK 138X60WITH RIGHT AND LEFT STAGE, LEFT WING, AND BACKSTAGE, TOTAL DECK AREA 19,864.ONE (1) 24X36X12 FRONT OF HOUSE, ONE (1) 29X26X31.5 FOH SPOT TOWER, TWO (2) 6X6X40 DELAY TOWERSSETUP 5/14/2026- REMOVE 5/29/2026ASSEMBLY |
| Floor / unit | — |
| Estimated cost | $206,000 |
| Approved | April 21, 2026 |
| Issued | April 23, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Brooke Elkins