New Construction Stage Structures at 337 E Randolph St
337 E RANDOLPH ST, Loop
What was permitted
This permit is for the temporary erection of five significant stage structures for a 2-day event in Chicago's Loop. The largest structure is a substantial stage deck with wings, designed for public assembly.
Issued on April 23, 2026, with a reported cost of $206,000, these structures are scheduled for setup from May 14, 2026, to May 29, 2026. C3 PRESENTS LLC is the contact for this new construction project.
The Loop will host a large event featuring multiple temporary stage structures, with a significant reported construction cost of $206,000.
What it cost
Issued
April 23, 2026
Expires
—
License
—
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by C3 PRESENTS LLC · 18 permits across 2 areas
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 101081873 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | — |
| Status | ACTIVE |
| Job Description | PERMIT EXPIRES ON 06/23/2026 ERECTION STARTS: 5/14/2026, ERECTION ENDS: 5/29/2026. C3 PRESENTS - SUEÑOS 2026 STAGE AND STRUCTURESSTAGE AND STRUCTURES- PEER REVIEW, SELF-CERT, 2 DAY EVENT 5/23/2026-5/24/2026ERECT FIVE (5) STRUCTURES- ONE (1) 79X51X64, STAGE DECK 138X60WITH RIGHT AND LEFT STAGE, LEFT WING, AND BACKSTAGE, TOTAL DECK AREA 19,864.ONE (1) 24X36X12 FRONT OF HOUSE, ONE (1) 29X26X31.5 FOH SPOT TOWER, TWO (2) 6X6X40 DELAY TOWERSSETUP 5/14/2026- REMOVE 5/29/2026ASSEMBLY |
| Floor / Unit | — |
| Estimated Cost | $206,000 |
| Approved | April 21, 2026 |
| Issued | April 23, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property Owner
BROOKE ELKINS