Skip to content
Event ProductionLoopPermit issued

Event Structures for Lollapalooza at 337 E RANDOLPH ST, Loop

337 E RANDOLPH ST, Loop

Winston

Sinra's conciergeOnline now

Planning event production work near Loop? I’ll scope it, price it, and line up the right pro.

Reported project cost

$1,440,600

As declared on the permit filing.

Issued
July 15, 2026
Expires
—
License
—

What was permitted

This permit is for the erection of multiple temporary platform structures for the Lollapalooza event, located at 337 E RANDOLPH ST in Chicago's Loop neighborhood. The project involves constructing sixteen distinct platforms, including stages and mezzanine areas, for the four-day festival.

Issued on July 15, 2026, this NEW CONSTRUCTION permit is ACTIVE and has a reported project cost of $1,440,600. The assembly and removal of these structures are scheduled between July 15 and August 9, 2026, with INPRODUCTION INC as the contractor.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101085593
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionPERMIT EXPIRES ON 09/15/2026 ERECTION STARTS: 7/15/2026, ERECTION ENDS: 8/9/2026. C3 PRESENTS LOLLAPALOOZA - INPRODUCTION PLATFORMSPLATFORMS- SELF-CERT- 4 DAY EVENT 7/30/26 ¿ 8/2/26ERECT SIXTEEN (16) PLATFORM STRUCTURES- ONE (1) 265X50 PLATFORM, ONE (1) 200X37 PLATFORM, ONE (1) 200X70 PLATFORM, ONE (1) 45X30 PLATFORM, ONE (1) 90X100 PLATFORM, ONE (1) 70X60 PLATFORM, ONE (1) 70X40 PLATFORM, ONE (1) 52X85 PLATFORM, ONE (1) 40X20 PLATFORM, ONE (1) 33X82 (10MX25M) MEZZANINE STRUCTURE, ONE (1) 100X37 PLATFORM, ONE (1) 32X32 PLATFORM, ONE (1) 20X25 PLATFORM (STAGE), ONE (1) 33X66 (10MX20M) MEZZANINE, ONE (1) 22X62 PLATFORM, AND ONE (1) 170X15 PLATFORM.SETUP 7/15/2026- REMOVE 8/9/2026, ASSEMBLY.
Floor / unit—
Estimated cost$1,440,600
ApprovedJuly 7, 2026
IssuedJuly 15, 2026
Expires—
BBL—
BIN—

Property owner

Brooke Elkins

Related searches

event structuresLollapaloozaLoopChicagonew construction$1,440,600