Event Structures for Lollapalooza at 337 E RANDOLPH ST, Loop
337 E RANDOLPH ST, Loop
What was permitted
This permit is for the erection of multiple temporary platform structures for the Lollapalooza event, located at 337 E RANDOLPH ST in Chicago's Loop neighborhood. The project involves constructing sixteen distinct platforms, including stages and mezzanine areas, for the four-day festival.
Issued on July 15, 2026, this NEW CONSTRUCTION permit is ACTIVE and has a reported project cost of $1,440,600. The assembly and removal of these structures are scheduled between July 15 and August 9, 2026, with INPRODUCTION INC as the contractor.
The Loop neighborhood will host Lollapalooza with numerous temporary structures at 337 E RANDOLPH ST, with a significant reported project cost of $1,440,600.
What it cost
Issued
July 15, 2026
Expires
—
License
—
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by INPRODUCTION INC · 2 permits across 1 area
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 101085593 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | — |
| Status | ACTIVE |
| Job Description | PERMIT EXPIRES ON 09/15/2026 ERECTION STARTS: 7/15/2026, ERECTION ENDS: 8/9/2026. C3 PRESENTS LOLLAPALOOZA - INPRODUCTION PLATFORMSPLATFORMS- SELF-CERT- 4 DAY EVENT 7/30/26 ¿ 8/2/26ERECT SIXTEEN (16) PLATFORM STRUCTURES- ONE (1) 265X50 PLATFORM, ONE (1) 200X37 PLATFORM, ONE (1) 200X70 PLATFORM, ONE (1) 45X30 PLATFORM, ONE (1) 90X100 PLATFORM, ONE (1) 70X60 PLATFORM, ONE (1) 70X40 PLATFORM, ONE (1) 52X85 PLATFORM, ONE (1) 40X20 PLATFORM, ONE (1) 33X82 (10MX25M) MEZZANINE STRUCTURE, ONE (1) 100X37 PLATFORM, ONE (1) 32X32 PLATFORM, ONE (1) 20X25 PLATFORM (STAGE), ONE (1) 33X66 (10MX20M) MEZZANINE, ONE (1) 22X62 PLATFORM, AND ONE (1) 170X15 PLATFORM.SETUP 7/15/2026- REMOVE 8/9/2026, ASSEMBLY. |
| Floor / Unit | — |
| Estimated Cost | $1,440,600 |
| Approved | July 7, 2026 |
| Issued | July 15, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property Owner
BROOKE ELKINS