What was permitted
For those in the Loop interested in event-related construction costs, this permit details the erection of numerous temporary tents for the Chicago Marathon. The project involves setting up thirty-one structures of various sizes, including frame tents.
This permit is active and was issued on September 9, 2026, with a reported project cost of $117,100. The erection is scheduled to begin on September 24, 2026, and conclude on October 16, 2026, for a one-day event on October 11, 2026.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101088100 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON SMALL TENTSTENTS- SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT THIRTY-ONE (31) STRUCTURES, ONE (1) 10X30 FRAME, ONE (1) 16X15 FRAME, ONE (1) 20X20 FRAME, EIGHT (8) 20X30 FRAME, THREE (3) 20X40 FRAME, ONE (1) 20X60 FRAME, ONE (1) 20X80 STRUCTURE, ONE (1) 20X140 STRUCTURE, ONE (1) 30X20 STRUCTURE, ONE (1) 30X30 FRAME, ONE (1) 30X40 STRUCTURE, TWO (2) 30X60 FRAME, THREE (3) 30X60 STRUCTURE, ONE (1) 30X70 FRAME, ONE (1) 30X90 STRUCTURE, ONE (1) 40X40 STRUCTURE, ONE (1) 40X50 STRUCTURE, ONE (1) 40X60 STRUCTURE, AND ONE (1) 40X90 STRUCTURE. SETUP 9/24/2026- REMOVE 10/16/2026, ASSEMBLY |
| Floor / unit | — |
| Estimated cost | $117,100 |
| Approved | September 6, 2026 |
| Issued | September 9, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Greg Hipp
Related searches