What was permitted
For those in the Loop interested in event infrastructure, a recent permit details the erection of multiple large tents. This project is associated with the Chicago Marathon and includes eleven distinct structures of various sizes.
Issued on September 22, 2026, this permit has a reported project cost of $338,000 and is scheduled for setup starting September 24, 2026, and removal by October 16, 2026. The contractor is Partytime-HDO Operations LLC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101088101 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 11/22/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON LARGE TENTSTENTS- PEER REVIEW- SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT ELEVEN (11) STRUCTURES, ONE (1) 20X210 STRUCTURE, ONE (1) 30X150 STRUCTURE, ONE (1) 30X200 STRUCTURE, ONE (1) 40X148 STRUCTURE, ONE (1) 40X180 STRUCTURE, ONE (1) 50X150 STRUCTURE, ONE (1) 60X100 POLE, ONE (1) 66X312 STRUCTURE, ONE (1) 82X100 STRUCTURE, ONE (1) 82X214 STRUCTURE, AND ONE (1) 100X250 POLE. SETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY |
| Floor / unit | — |
| Estimated cost | $338,000 |
| Approved | September 6, 2026 |
| Issued | September 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Greg Hipp
Related searches