Skip to content
General ConstructionLoopPermit issued

Large Tent Erection for Chicago Marathon at 337 E Randolph St, Loop

337 E RANDOLPH ST, Loop

Winston

Sinra's conciergeOnline now

Planning general construction work near Loop? I’ll scope it, price it, and line up the right pro.

Reported project cost

$338,000

As declared on the permit filing.

Issued
September 22, 2026
Expires
—
License
—

What was permitted

For those in the Loop interested in event infrastructure, a recent permit details the erection of multiple large tents. This project is associated with the Chicago Marathon and includes eleven distinct structures of various sizes.

Issued on September 22, 2026, this permit has a reported project cost of $338,000 and is scheduled for setup starting September 24, 2026, and removal by October 16, 2026. The contractor is Partytime-HDO Operations LLC.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101088101
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionPERMIT EXPIRES ON 11/22/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON LARGE TENTSTENTS- PEER REVIEW- SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT ELEVEN (11) STRUCTURES, ONE (1) 20X210 STRUCTURE, ONE (1) 30X150 STRUCTURE, ONE (1) 30X200 STRUCTURE, ONE (1) 40X148 STRUCTURE, ONE (1) 40X180 STRUCTURE, ONE (1) 50X150 STRUCTURE, ONE (1) 60X100 POLE, ONE (1) 66X312 STRUCTURE, ONE (1) 82X100 STRUCTURE, ONE (1) 82X214 STRUCTURE, AND ONE (1) 100X250 POLE. SETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY
Floor / unit—
Estimated cost$338,000
ApprovedSeptember 6, 2026
IssuedSeptember 22, 2026
Expires—
BBL—
BIN—

Property owner

Greg Hipp

Related searches

event tentsLoopChicagoNew Construction PermitChicago Marathon$338,000 project cost