What was permitted
A temporary event structure is being erected for the Chicago Marathon, including a start line box truss, a finish line LED box truss, and a platform. This project involves the setup and removal of these structures within a specific timeframe.
This permit is active and was issued on September 9, 2026, with an estimated project cost of $60,000. The work is scheduled to begin on September 24, 2026, and conclude on October 16, 2026, with PARTYTIME-HDO OPERATIONS LLC as the contact.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101088105 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON BOX TRUSS STRUCTURESSTRUCTURES- PEER REVIEW- REINSTATE 101073748, SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT THREE (3) STRUCTURES, ONE (1) 65X7X19.5 START LINE BOX TRUSS, 54X12X15.5 FINISH LINE LED BOX TRUSS, 52X24X18.5 PLATFORM AND BOX TRUSS.SETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY |
| Floor / unit | — |
| Estimated cost | $60,000 |
| Approved | September 6, 2026 |
| Issued | September 9, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Greg Hipp
Related searches