Skip to content
SolarSeacliffPermit issued

Solar and Energy Storage Installation at 540 El Camino Del Mar, San Francisco

540 El Camino Del Mar, Seacliff, 94121

Winston

Sinra's conciergeOnline now

Planning solar work near Seacliff? I’ll scope it, price it, and line up the right pro.

Reported project cost

$93,600

As declared on the permit filing.

Issued
June 23, 2026
Expires
—
License
—

What was permitted

This permit is for the installation of a solar energy system and associated energy storage units at a property in San Francisco's Seacliff neighborhood. The system includes multiple Tesla Powerwall 3 batteries and a Tesla Backup Gateway.

Issued on June 23, 2026, the estimated cost for this solar and energy storage installation is $93,600. Luminalt Energy Corporation is the contractor responsible for this project.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Seacliff, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking numberS20260515612
Work permit #—
Job filing number—
Work type—
Statusissued
Job descriptionsolar permit: mounted: roof, ballasted: n, including 7 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of energy storage system only. system includes: (1) tesla backup gateway 3, (4) tesla powerwall 3 battery/in
Floor / unit—
Estimated cost$93,600
ApprovedJune 18, 2026
IssuedJune 23, 2026
Expires—
BBL—
BIN—

Related searches

solarenergy storageSeacliffSan FranciscoTesla Powerwallsolar installation$93,600Luminalt Energy Corporation