Skip to content
General ConstructionNew CityPermit issued

Renovation Project at 613 W 47TH ST, New City

613 W 47TH ST, New City

Winston

Sinra's conciergeOnline now

Planning general construction work near New City? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit.

Issued
July 7, 2026
Expires
—
License
—

What was permitted

A significant renovation project is underway at 613 W 47TH ST in Chicago's New City neighborhood. This involves a two-story addition to an existing general manufacturing facility, specifically for tofu processing, with structural elements being pre-cast concrete.

This renovation permit was issued on July 7, 2026, and is currently active. While the permit fee was $2,399.46, the overall project cost for this type of industrial expansion can vary significantly. SCHWAN ELECTRIC CONTRACTING is listed as the contact.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in New City, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101079592
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionSPR 2019 CBC: REVISION TO PERMIT 101057506 TO CHANGE THE PERMITTED STRUCTURAL ELEMENTS TO PRE CAST CONCRETE FOR 2 STORY, I-B ADDITION TO EXISTING 1 STORY, III-A GENERAL MANUFACTURING TOFU PROCESSING FACILITY AS PER PLANS (OCCUPANCY: F1 & S1; CONST. TYPE I-B) *STRUCTURAL PEER REVIEW*
Floor / unit—
Estimated costNot reported
ApprovedMarch 10, 2026
IssuedJuly 7, 2026
Expires—
BBL—
BIN—

Property owner

Eric Cheng

Related searches

renovationindustrial additionNew CityChicagopermitstructuralmanufacturing facility