Skip to content
Solar InstallationWest LawnPermit issued

Solar Panel Installation at Hubbard High School, West Lawn

6200 S HAMLIN AVE, West Lawn

Winston

Sinra's conciergeOnline now

Planning solar installation near West Lawn? I’ll scope it, price it, and line up the right pro.

Reported project cost

$683,704

As declared on the permit filing.

Issued
November 4, 2026
Expires
—
License
—

What was permitted

A significant solar photovoltaic (PV) system is being installed on the rooftops of Hubbard High School in the West Lawn neighborhood. This project involves a 157.80KW system and associated electrical work, designed for an existing Chicago Public School building.

This renovation project was issued a permit on November 4, 2026, with a substantial reported cost of $683,704. B T ELECTRIC is the contractor for this large-scale solar installation, which has undergone structural peer review.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in West Lawn, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number101083986
Work permit #—
Job filing number—
Work type—
StatusACTIVE
Job descriptionSPR 2019 CBRC: CPS SCHOOL: INSTALLATION OF NEW 157.80KW SOLAR PV SYSTEM AND ASSOCIATED ELECTRICAL WORK ON EXISTING ROOFTOPS AT EXISTING CITY OF CHICAGO PUBLIC SCHOOL, HUBBARD HIGH SCHOOL, AS PER PLANS. (STRUCTURAL PEER REVIEW (OCCUPANCY GROUP: E-1; TYPE 1B CONSTRUCTION)
Floor / unit—
Estimated cost$683,704
ApprovedAugust 19, 2026
IssuedNovember 4, 2026
Expires—
BBL—
BIN—

Property owner

Chicago Public Schools

Related searches

solar PV systemWest LawnChicagoRenovation/Alteration$683,704Hubbard High School