What was permitted
A significant solar photovoltaic (PV) system is being installed on the rooftops of Hubbard High School in the West Lawn neighborhood. This project involves a 157.80KW system and associated electrical work, designed for an existing Chicago Public School building.
This renovation project was issued a permit on November 4, 2026, with a substantial reported cost of $683,704. B T ELECTRIC is the contractor for this large-scale solar installation, which has undergone structural peer review.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West Lawn, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 101083986 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | — |
| Status | ACTIVE |
| Job description | SPR 2019 CBRC: CPS SCHOOL: INSTALLATION OF NEW 157.80KW SOLAR PV SYSTEM AND ASSOCIATED ELECTRICAL WORK ON EXISTING ROOFTOPS AT EXISTING CITY OF CHICAGO PUBLIC SCHOOL, HUBBARD HIGH SCHOOL, AS PER PLANS. (STRUCTURAL PEER REVIEW (OCCUPANCY GROUP: E-1; TYPE 1B CONSTRUCTION) |
| Floor / unit | — |
| Estimated cost | $683,704 |
| Approved | August 19, 2026 |
| Issued | November 4, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Chicago Public Schools
Related searches