General ConstructionLoopPermit Issued

Office to Residential Conversion at 79 W Monroe St

79 W MONROE ST, Loop

1

What was permitted

A significant renovation is underway in the Loop to convert multiple floors of an existing mixed-use building from office space to residential units. This project involves substantial alterations to room layouts, MEP systems, and the replacement of a diesel generator with a natural gas one.

Issued on May 14, 2026, this active permit has an estimated project cost of $950,000. Leopardo Construction Inc. is the contractor for this extensive conversion.

Residents in the Loop may see a large-scale conversion of office space to residential units, with this project estimated at $950,000.

2

What it cost

$950,000reported on this filing

Issued

May 14, 2026

Expires

License

3

Price your own project

See what a project like this costs near you

We'll compare your scope against real permits and licensed contractors in the area.

Start my estimate →

Free · takes 60 seconds · no account needed

Filed by LEOPARDO CONSTRUCTION INC · 3 permits across 3 areas

View the official permit record

Tracking number, work description, cost, and dates

+
Tracking Number101077355
Work Permit #
Job Filing Number
Work Type
StatusACTIVE
Job DescriptionDDS 2019 CBRC: REVISION TO PERMIT 101062067 FOR ALTERATION AND CHANGE OF USE ON FLOORS 7-14 OF EXISTING MIXED USE BUILDING FROM OFFICE TO RESIDENTIAL. REVISIONS INCLUDE ALTERATIONS TO ROOM AND MEP LAYOUT, REPLACING DIESEL EMERGENCY GENERATOR WITH NATURAL GAS EMERGENCY GENERATOR AND REMOVAL OF DIESEL GAS LINE AND SHAFT ASSEMBLY. RELOCATION OF BUILDING'S STEAM LOOP. REPLACEMENT OF SELECT LEVEL 7 FAN ROOM WINDOWS WITH METAL LOUVERED PANELS. (OCUPANCY R-2, E-1, M, A-3; CONSTRUCTION TYPE IA) CONSULTANT REVIEWER: V3 COMPANIES OF IL
Floor / Unit
Estimated Cost$950,000
ApprovedDecember 16, 2025
IssuedMay 14, 2026
Expires
BBL
BIN

Property Owner

BROWN DERBY LLC

Related Searches

renovationalterationchange of useoffice to residentialLoopChicago$950,000 project cost