What was permitted
Businesses in San Francisco's Financial District/South Beach may encounter permit revisions for ongoing office renovations, as seen with this project at 405 Howard St. This specific permit is an amendment to an earlier approval, focusing on detailing occupancy loads and designated assembly areas within the 8th-floor office space.
Issued on April 7, 2026, this revision addresses specific areas including an 8300 sq ft outdoor deck, an 8301 sq ft east patio, and breakroom 8246. The contractor for this revision is Skyline Construction. The reported cost for this revision is not available.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202511189853 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Additions & Alterations · Office |
| Status | issued |
| Job description | rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246) |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | April 6, 2026 |
| Issued | April 7, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches