What was permitted
Commercial property owners in the West of Twin Peaks area can reference this permit for the costs associated with upgrading building entrances to meet ADA standards. This project includes sidewalk, ramp, and handrail replacements, as well as automatic door actuators.
Issued on May 6, 2026, this significant upgrade for an office building had an estimated cost of $262,441. Profound Systems Inc. was the contractor for this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West of Twin Peaks, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202104309617 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Additions & Alterations · Office |
| Status | issued |
| Job description | bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depository |
| Floor / unit | — |
| Estimated cost | $262,441 |
| Approved | May 1, 2026 |
| Issued | May 6, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches