What was permitted
Homeowners in West San Jose considering an Accessory Dwelling Unit (ADU) can find valuable cost information from this legalization permit. This project involves bringing a detached ADU up to code.
This ADU legalization permit was issued on September 23, 2026, with an estimated project cost of $80,571 for the detached ADU. The work is described as EPR CODE AMNESTY (BEPM 100%) LEGALIZE DETACH ADU.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West San Jose, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-134618-RS |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | ADU Legalization · ADU Accessory Dwelling Unit |
| Status | Issued |
| Job description | EPR CODE AMNESTY (BEPM 100%) LEGALIZE DETACH ADU |
| Floor / unit | — |
| Estimated cost | $80,571 |
| Approved | — |
| Issued | September 23, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Kolli Murali K And Padma Trustee
Related searches