Skip to content
General ConstructionNoe ValleyPermit issued

Single-Family Dwelling Revisions at 350 Day St, Noe Valley

350 Day St, Noe Valley, 94131

Winston

Sinra's conciergeOnline now

Planning general construction work near Noe Valley? I’ll scope it, price it, and line up the right pro.

Reported project cost

$10,000

As declared on the permit filing. Alterations · 1 Family Dwelling.

Issued
November 9, 2026
Expires
—
License
—

What was permitted

This permit details revisions to an existing single-family dwelling, focusing on structural and layout changes. The work includes removing a rear stair, converting a full bathroom to a half bath, and modifying master closet and bathroom designs.

Issued on November 9, 2026, the estimated project cost for these alterations is $10,000. Green City Construction Inc. is the contractor for this Noe Valley home improvement project.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Noe Valley, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number202611050410
Work permit #—
Job filing number—
Work typeAlterations · 1 Family Dwelling
Statusissued
Job descriptionrevision to pa# 202103126513. remove rear stair, change the 2/f full bathroom to 1/2 bath, change the master closet and master bathroom design, remove the interior stair post on the structural plan. relocate one shearwall on level 3
Floor / unit—
Estimated cost$10,000
ApprovedNovember 9, 2026
IssuedNovember 9, 2026
Expires—
BBL—
BIN—

Related searches

1 family dwellingalterationsbathroom renovationstair removalSan FranciscoNoe Valley$10,000general construction