What was permitted
For those in the Financial District/South Beach neighborhood, understanding the costs of HVAC upgrades is key. This permit is for the installation of a mini-split AC system specifically for the elevator equipment room in an apartment building.
Issued on October 28, 2026, this project has an estimated cost of $40,000 and was handled by General Air Technology.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202609027569 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Apartments |
| Status | issued |
| Job description | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof |
| Floor / unit | — |
| Estimated cost | $40,000 |
| Approved | October 28, 2026 |
| Issued | October 28, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches