What was permitted
Similar to another permit in the area, this project at 550 Battery St in San Francisco's Financial District/South Beach involves installing a mini-split air conditioning system for the elevator equipment room. The scope includes rooftop condenser placement and connecting power and condensate drainage.
This alteration permit was issued on October 28, 2026, with an estimated project cost of $40,000. General Air Technology is the contractor for this HVAC upgrade at the apartment building.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202609027568 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Apartments |
| Status | issued |
| Job description | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof |
| Floor / unit | — |
| Estimated cost | $40,000 |
| Approved | October 28, 2026 |
| Issued | October 28, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches