What was permitted
This project in the Castro/Upper Market neighborhood involved significant repairs to exterior walkways on a three-level apartment building. The work included removing existing concrete topping and sheathing, installing a new waterproofing deck coating system, and replacing wood guard railings with metal.
Issued on July 29, 2026, this alteration project had an estimated cost of $150,000. Empnc Inc. Dba Empire Community Painting was the contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Castro/Upper Market, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202607134951 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Apartments |
| Status | issued |
| Job description | repair (e) 3 level exterior walkways by removing (e) conc. topping & sheathing with (n) waterproofing deck coating system over (n) sheating. replace (e) wood guard railings w/ metal. |
| Floor / unit | — |
| Estimated cost | $150,000 |
| Approved | July 29, 2026 |
| Issued | July 29, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches