What was permitted
This permit in San Francisco's Tenderloin details significant alterations to improve wheelchair accessibility. The project involves removing an existing wheelchair lift and installing a new one to provide access from the east entry to the main lobby.
The permit was issued on June 22, 2026, with an estimated project cost of $373,300. This work includes necessary structural modifications to accommodate the new lift. The contractor is listed as unknown.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Tenderloin, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202507301908 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Office |
| Status | issued |
| Job description | scope: consist of readily achievable barrier removal of wheelchair lift proposed to allow access from the east entry to the main lobby level removal of existing wheelchair lift, patch and repair of the floor after existing lift is removed. install new lift including necessary structural |
| Floor / unit | — |
| Estimated cost | $373,300 |
| Approved | June 22, 2026 |
| Issued | June 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches