Skip to content
General ConstructionFinancial District/South BeachPermit issued

Office Strengthening at 1 Harrison St, San Francisco

1 Harrison St, Financial District/South Beach, 94105

Winston

Sinra's conciergeOnline now

Planning general construction work near Financial District/South Beach? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit. Alterations · Office.

Issued
April 13, 2026
Expires
—
License
—

What was permitted

This permit details significant structural updates to an office space located in San Francisco's Financial District/South Beach neighborhood. The work involves revising existing strengthening measures by replacing fiberglass-reinforced plastic (FRP) with steel tube components for five columns on the first level.

The permit was issued on April 13, 2026, and is a revision to previous permits. While the exact cost is not listed, such structural upgrades can represent a substantial investment in commercial property.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number202604079048
Work permit #—
Job filing number—
Work typeAlterations · Office
Statusissued
Job descriptionrevision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening.
Floor / unit—
Estimated costNot reported
ApprovedApril 13, 2026
IssuedApril 13, 2026
Expires—
BBL—
BIN—

Related searches

office alterationsstructural strengtheningsteel tubeFinancial District/South BeachSan Franciscocommercial construction