What was permitted
A significant mechanical project is underway at 1 Sansome St in San Francisco's Financial District/South Beach, involving the installation of a 2000-gallon double-wall underground storage tank in the sidewalk. This tank will replace a previously removed one.
Permitted on June 12, 2026, this project has an estimated cost of $100,000. Fuel Oil System is the contractor, and the work includes installing a new pump, piping, control panel, and leak detection sensors.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202606022343 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Office |
| Status | issued |
| Job description | install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoring |
| Floor / unit | — |
| Estimated cost | $100,000 |
| Approved | June 12, 2026 |
| Issued | June 12, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |