Skip to content
General ConstructionFinancial District/South BeachPermit issued

Office Structural Work at 221 Main St, San Francisco

221 Main St, Financial District/South Beach, 94105

Winston

Sinra's conciergeOnline now

Planning general construction work near Financial District/South Beach? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit. Alterations · Office.

Issued
September 23, 2026
Expires
—
License
—

What was permitted

This permit covers structural work on the 12th floor of an office building at 221 Main St in San Francisco's Financial District. The project involves showing the anchorage of IDF racks and removing a seismic bracing requirement for ductwork.

The permit was issued on September 23, 2026. While the cost is not listed, this type of structural alteration can vary significantly depending on the complexity and specific requirements.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number202609148077
Work permit #—
Job filing number—
Work typeAlterations · Office
Statusissued
Job description12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419.
Floor / unit—
Estimated costNot reported
ApprovedSeptember 23, 2026
IssuedSeptember 23, 2026
Expires—
BBL—
BIN—

Related searches

office alterationsstructural workFinancial District/South BeachSan Franciscocommercial renovationIDF racks