What was permitted
This permit covers the first-time installation of three pre-manufactured accessible meeting pods in an office space. The pods will require seismic anchoring, and electrical, fire alarm, and fire sprinkler systems will be designed and installed by contractors.
This project was issued on August 6, 2026, with an estimated cost of $134,000. Skyline Construction is listed as the contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Potrero Hill, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202605261826 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Office |
| Status | issued |
| Job description | 1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scope |
| Floor / unit | — |
| Estimated cost | $134,000 |
| Approved | August 6, 2026 |
| Issued | August 6, 2026 |
| Expires | — |