Skip to content
ElectricalFinancial District/South BeachPermit issued

Electrical Fire Safety Work at 55 Spear St, San Francisco

55 Spear St, Financial District/South Beach, 94105

Winston

Sinra's conciergeOnline now

Planning electrical work near Financial District/South Beach? I’ll scope it, price it, and line up the right pro.

Reported project cost

$12,008

As declared on the permit filing. Alterations · Office.

Issued
April 29, 2026
Expires
—
License
—

What was permitted

Electrical work focused on fire safety has been permitted for the 13th floor of the Stewart Tower in San Francisco's Financial District/South Beach. This project involves adding two two-way communication stations in the passenger and freight elevator lobbies.

The permit was issued and is currently active as of April 29, 2026, with an estimated project cost of $12,008. Metropolitan Electrical Construction is the contractor for this specialized electrical installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number202604280191
Work permit #—
Job filing number—
Work typeAlterations · Office
Statusissued
Job descriptionfloor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done.
Floor / unit—
Estimated cost$12,008
ApprovedApril 29, 2026
IssuedApril 29, 2026
Expires—
BBL—
BIN—

Related searches

electricalFinancial District/South BeachSan Franciscoalterationsofficefire safety$10,000-$15,000