What was permitted
For businesses in the Financial District/South Beach area, this permit provides a cost example for installing new office communication systems. The project included two new Rath call stations with mushroom buttons and signage on the 4th floor.
This alteration project for an office space was completed and issued on May 28, 2026, with an estimated cost of $12,008. The installation is part of a two-way emergency communication system backbone. Bilcor Inc was the contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Financial District/South Beach, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 202605282042 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Alterations · Office |
| Status | complete |
| Job description | 4th floor: install (2) new call station rath 2400-808nspm w/ mushroom button(flush mount). install (2) call station signage. two-way els permanent backbone infrastructure permit #2021-0204-4083. arch. ref #2026-0303-6842 |
| Floor / unit | — |
| Estimated cost | $12,008 |
| Approved | May 28, 2026 |
| Issued | May 28, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches