What was permitted
For homeowners in Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass interested in ADU conversions, this permit offers insight into project costs. The work involves converting an existing 412 sq ft detached garage and adding 161 sq ft to create a new 573 sq ft ADU, based on engineered designs.
This ADU conversion project was issued a permit on May 29, 2026, with an estimated cost of $50,000. The contractor is unknown for this 1 or 2-family dwelling.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 26014-10000-01380 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Addition |
| Status | Issued |
| Job description | ePlan. Conversion of Existing Detached Garage(412 SF) and Addition (161 SF) to ADU (573 SF) Per GCS 66323(a)(4). Work Per Engineered Design. |
| Floor / unit | — |
| Estimated cost | $50,000 |
| Approved | April 14, 2026 |
| Issued | May 29, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches