What was permitted
This permit covers a temporary modification for The Brentwood School West Campus to accommodate an increased student enrollment due to wildfire displacement. The project aims to allow up to 360 students, a 20% increase from the current 300, for a short-term period.
The permit was issued on May 8, 2026, and is valid for 180 days. The reported cost is N/A, and the contractor is unknown as this is a commercial project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Brentwood - Pacific Palisades, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 25016-10000-33550 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | **ePlan**2025 Wildfire Project. EO4 **Ineligible Fire Alteration **** EO-4 project. Short-Term Temporary Use Authorization for The Brentwood School West Campus to allow a temporary modification to CPC-2015-3720-VCU-CU-SPR-ZAD-ZAA to increase enrollment by up to 20 percent to accommodate additional students who have been displaced as a result of recent 2025. The 20 percent increase in enrollment would allow a maximum of 360 students in lieu of 300 students in West Campus. ( Building 3 - Saltair Annex Building - Occupant Load in classrooms increased from 125 to 138).** Short-Term Temporary Permit pursuant to EO-4, valid for 180 days from the date of issuance. **A separate permit shall be obtained for each separate building, pursuant to Section 106.1 of the LABC, if the O.L. of the buildings will be permanently changed.****2 OF 2** |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | November 4, 2025 |
| Issued | May 8, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |