What was permitted
A significant project is underway at 1501 W Francisco St in the Harbor Gateway neighborhood of Los Angeles. This involves the extensive retrofitting of an existing data center, including the replacement of aging cooling units and the installation of new infrastructure to support future data needs.
This building alteration and repair project has been issued and was expected to be completed by October 1, 2026, with an estimated project cost of $7,000,000. The contractor is listed as unknown for commercial projects.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Harbor Gateway, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 26016-10000-13551 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | The project consist of retrofitting an existing data center building where the scope of work consists of the removal of (8) existing end-of-life DX CRAC units and replacing with like for like units in addition to installing (14) new DX CRAC units of the same capacity along with the added structural cubs needed to support the new units in the roof. In addition, there is a cage layout added to interior floor area denoted in the architectural drawings to support future data infrastructure with added structural drawings to support this. |
| Floor / unit | — |
| Estimated cost | $7,000,000 |
| Approved | May 27, 2026 |
| Issued | October 1, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches