Skip to content
General ConstructionWest Adams - Baldwin Hills - LeimertPermit issued

Methane Mitigation Design Revision at 2524 S 9th Ave, West Adams

2524 S 9TH AVE, West Adams - Baldwin Hills - Leimert, 90018

Winston

Sinra's conciergeOnline now

Planning general construction work near West Adams - Baldwin Hills - Leimert? I’ll scope it, price it, and line up the right pro.

Reported project cost

$2,501

As declared on the permit filing. Bldg-Alter/Repair.

Issued
September 2, 2026
Expires
—
License
1 or 2 Family Dwelling

What was permitted

This permit is a supplemental revision to an existing project at 2524 S 9th Ave in the West Adams - Baldwin Hills - Leimert neighborhood of Los Angeles. The work specifically addresses revisions to the methane mitigation design.

The permit has been issued, with an estimated project cost of $2,501, and is dated September 2, 2026. This type of revision is common for ensuring safety and compliance in construction projects, especially those involving potential environmental hazards. The contractor is unknown for this 1 or 2-family dwelling.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in West Adams - Baldwin Hills - Leimert, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number20014-10003-05100
Work permit #—
Job filing number—
Work typeBldg-Alter/Repair
StatusIssued
Job descriptionEPLAN: Supplemental to #20014-10000-05100 to revise methane mitigation design
Floor / unit—
Estimated cost$2,501
ApprovedAugust 11, 2026
IssuedSeptember 2, 2026
Expires—
BBL—
BIN—

Related searches

methane mitigationWest AdamsBaldwin HillsLeimertLos Angelesalteration permit$2,501 project cost