What was permitted
This permit details the removal of a dumbwaiter spanning two levels and the subsequent infill of the associated floor opening in a commercial building. This type of work often involves specialized crews to ensure structural integrity and safety during the process.
The project was issued on September 17, 2026, with an estimated cost of $25,000. The contractor is listed as Unknown (Commercial), indicating a professional firm likely handled this alteration.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Downtown, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 26016-10001-08189 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | Supplemental to 26016-10000-08189: Scope of work includes the demolition of the dumbwaiter spanning levels 32 and 33, and floor infill of the pit and floor opening on levels 32 and 33, respectively. Included with the structural sheets are three Architectural sheets: Reports, Construction Plan L32, and Construction Plan L33. |
| Floor / unit | — |
| Estimated cost | $25,000 |
| Approved | September 4, 2026 |
| Issued | September 17, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches