Skip to content
General ConstructionLos Angeles International AirportPermit issued

Structural Column Repair at Los Angeles International Airport

351 WORLD WAY, Los Angeles International Airport, 90045

Winston

Sinra's conciergeOnline now

Planning general construction work near Los Angeles International Airport? I’ll scope it, price it, and line up the right pro.

Reported project cost

$501

As declared on the permit filing. Bldg-Alter/Repair.

Issued
May 7, 2026
Expires
—
License
B

What was permitted

While this project is at a commercial facility, it provides insight into the cost of specialized structural repairs. The work at Los Angeles International Airport involved strengthening concrete columns to meet specific building code provisions, demonstrating a focus on safety and compliance.

Issued on May 7, 2026, this supplemental repair project had a remarkably low estimated cost of $501. This figure likely reflects a specific, targeted repair rather than a large-scale construction effort, offering a data point for very minor structural code compliance work.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number18014-10088-05940
Work permit #—
Job filing number—
Work typeBldg-Alter/Repair
StatusIssued
Job description**ePlan**LAX-APM**Project Under Construction**Supplemental to WCTA Station (18014-10000-05940) to address deficiencies in the ACI 318 14 Chapter 18, Section 18.14 code provisions related to the design and detailing requirements for columns that are not part of the seismic force resisting system. The concrete columns are brought into code compliance by strengthening them using one of the following methods: fiber reinforced polymer (FRP) wrapping, column enlargement, or steel plating.
Floor / unit—
Estimated cost$501
ApprovedFebruary 23, 2026
IssuedMay 7, 2026
Expires—
BBL—
BIN—

Related searches

structural repairLos Angeles International AirportLAXLos Angelesconcrete columnscode compliance$501 project