351 WORLD WAY, Los Angeles International Airport, 90045
While this project is at a commercial facility, it provides insight into the cost of specialized structural repairs. The work at Los Angeles International Airport involved strengthening concrete columns to meet specific building code provisions, demonstrating a focus on safety and compliance.
Issued on May 7, 2026, this supplemental repair project had a remarkably low estimated cost of $501. This figure likely reflects a specific, targeted repair rather than a large-scale construction effort, offering a data point for very minor structural code compliance work.
A specialized structural repair to concrete columns at LAX was permitted for a minimal $501, highlighting the cost of targeted code compliance work.
Issued
May 7, 2026
Expires
—
License
B
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Fluor Flatiron Balfour Beatty Dragados · 4 permits across 1 area
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 18014-10088-05940 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Bldg-Alter/Repair |
| Status | Issued |
| Job Description | **ePlan**LAX-APM**Project Under Construction**Supplemental to WCTA Station (18014-10000-05940) to address deficiencies in the ACI 318 14 Chapter 18, Section 18.14 code provisions related to the design and detailing requirements for columns that are not part of the seismic force resisting system. The concrete columns are brought into code compliance by strengthening them using one of the following methods: fiber reinforced polymer (FRP) wrapping, column enlargement, or steel plating. |
| Floor / Unit | — |
| Estimated Cost | $501 |
| Approved |
| February 23, 2026 |
| Issued | May 7, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |