What was permitted
A deferred submittal and supplemental permit has been issued for alteration work at 380 World Way, located within the Los Angeles International Airport (LAX) area. This permit is specifically for the suspended bar canopy's WX framing, designed to handle structural loads.
Issued on May 11, 2026, with an estimated project cost of $501, this permit is part of a larger project currently under construction. The work involves structural framing details as indicated on approved drawings.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 24016-10004-37527 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | **ePlan**LAX**Project Under Construction**Attn: Farshad**DEFERRED SUBMITTAL/SUPPLEMENTAL PERMIT TO PERMIT#24016-10000-37527 FOR THE SUSPENDED BAR CANOPYWX FRAMING DESIGNED TO SUPPORT THE GRAVITY AND LATERALLOADS FROM THE SUSPENDED BAR CANOPY IS INDICATED ON SHEETS02-05 OF THE APPROVED DRAWINGS |
| Floor / unit | — |
| Estimated cost | $501 |
| Approved | March 2, 2026 |
| Issued | May 11, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches