Skip to content
Structural EngineeringLos Angeles International AirportPermit issued

Structural Repair at Los Angeles International Airport

380 WORLD WAY, Los Angeles International Airport, 90045

Winston

Sinra's conciergeOnline now

Planning structural engineering work near Los Angeles International Airport? I’ll scope it, price it, and line up the right pro.

Reported project cost

$5,000

As declared on the permit filing. Bldg-Alter/Repair.

Issued
August 17, 2026
Expires
—
License
Commercial

What was permitted

A structural repair is underway at Los Angeles International Airport, specifically addressing damage to a girder. The repair involves using a Carbon Fiber Reinforced Polymer (CFRP) wrap to restore the structural integrity of the affected area.

This supplemental permit was issued on August 17, 2026, with an estimated project cost of $5,000. The contractor is listed as unknown for this commercial project.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number24016-10009-13320
Work permit #—
Job filing number—
Work typeBldg-Alter/Repair
StatusIssued
Job descriptionAttention to Farshad AlimohamadiLAXThis is a supplemental permit to Permit No. 24016-10000-13320. The original floor opening was reviewed and approved under Permit No. 24016-10007-13320. During construction, the contractor slightly overcut the south edge of the floor opening, resulting in one leg of (13) #5 shear ties in the girder being cut near the southeast corner. To restore the lost shear capacity, the damaged girder will be repaired with a 3-sided CFRP wrap. This package identifies the damaged girder location and provides repair details. The repair will utilize the LOCTITE Tyfo CFRP System, designed to provide shear capacity equivalent to one leg of a #5 Grade 60 steel stirrup spaced at 5 inches on center. The CFRP wrap also provides additional confinement of the existing concrete girder top longitudinal bar.
Floor / unit—
Estimated cost$5,000
ApprovedJuly 22, 2026
IssuedAugust 17, 2026
Expires—
BBL—
BIN—

Related searches

structural repairLos Angeles International AirportLos Angelesairport construction$1k-$10k costCFRP wrap