What was permitted
A structural repair is underway at Los Angeles International Airport, specifically addressing damage to a girder. The repair involves using a Carbon Fiber Reinforced Polymer (CFRP) wrap to restore the structural integrity of the affected area.
This supplemental permit was issued on August 17, 2026, with an estimated project cost of $5,000. The contractor is listed as unknown for this commercial project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 24016-10009-13320 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | Attention to Farshad AlimohamadiLAXThis is a supplemental permit to Permit No. 24016-10000-13320. The original floor opening was reviewed and approved under Permit No. 24016-10007-13320. During construction, the contractor slightly overcut the south edge of the floor opening, resulting in one leg of (13) #5 shear ties in the girder being cut near the southeast corner. To restore the lost shear capacity, the damaged girder will be repaired with a 3-sided CFRP wrap. This package identifies the damaged girder location and provides repair details. The repair will utilize the LOCTITE Tyfo CFRP System, designed to provide shear capacity equivalent to one leg of a #5 Grade 60 steel stirrup spaced at 5 inches on center. The CFRP wrap also provides additional confinement of the existing concrete girder top longitudinal bar. |
| Floor / unit | — |
| Estimated cost | $5,000 |
| Approved | July 22, 2026 |
| Issued | August 17, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches