What was permitted
This permit details modifications to an existing ADA ramp at the Mixing Box Level 1 area of Los Angeles International Airport. The work involves removing a section of the current ramp, constructing a new landing, and installing a connecting ramp to ensure a continuous accessible path.
This project was issued on September 14, 2026, with an estimated cost of $12,000. The contractor is listed as Unknown (Commercial).
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 24016-10010-13320 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | supplemental permit to Permit No. 24016-10000-13320.The project scope consists of modifying the existing ADA ramp at the Mixing Box Level 1 area. Work includes removing a portion of the existing ramp, constructing a new landing, and installing a new connecting ramp section to provide a continuous connection to the existing ramp. Including structural calcs for the new ramp |
| Floor / unit | — |
| Estimated cost | $12,000 |
| Approved | August 11, 2026 |
| Issued | September 14, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches