General ConstructionLos Angeles International AirportPermit Issued

Terminal Modernization at Los Angeles International Airport

380 WORLD WAY, Los Angeles International Airport, 90045

1

What was permitted

This permit outlines a significant modernization project at the Tom Bradley International Terminal at Los Angeles International Airport. The scope includes selective demolition, structural work like beam relocation, and extensive renovations to finishes, MEP systems, and baggage carousel reconfiguration.

Issued on May 22, 2026, this large-scale project has an estimated cost of $14,000,000. The contractor for this extensive work is Clark / Mccarthy A Joint Venture.

Major airport infrastructure projects, like the $14 million modernization at LAX, involve complex renovations and structural changes.

2

What it cost

$14,000,000reported on this filing

Issued

May 22, 2026

Expires

License

B

3

Price your own project

See what a project like this costs near you

We'll compare your scope against real permits and licensed contractors in the area.

Start my estimate →

Free · takes 60 seconds · no account needed

Filed by Clark / Mccarthy A Joint Venture · 2 permits across 1 area

View the official permit record

Tracking number, work description, cost, and dates

+
Tracking Number25016-10000-36592
Work Permit #
Job Filing Number
Work TypeBldg-Alter/Repair
StatusIssued
Job DescriptionMODERNIZATION OF SELECT AREAS AND SYSTEMS AT THE EXISTING TOM BRADLEY INTERNATIONAL TERMINAL AT ARRIVALS LEVEL 1: Selective demolition of partition walls, finishes, ceilings, terrazzo flooring, topping slabs at entry points, restroom lavatories, fixtures, and associated equipment. Structural work includes removal and relocation of one moment frame beam to a higher position on the same frame. Renovations include new topping slabs at ramps, terrazzo flooring, new partitions, ceilings, lighting, MEP systems, and associated fixtures and equipment. The existing baggage carousel will be reconfigured to increase capacity. Accessibility upgrades include new ramps with compliant slopes, equipment mounted at code-required heights, and accessible restroom lavatories. No changes to the path of travel to restrooms, elevators, or exits.
Floor / Unit
Estimated Cost$14,000,000
ApprovedDecember 23, 2025
IssuedMay 22, 2026
Expires
BBL
BIN

Related Searches

terminal modernizationairport constructionLos Angeles International AirportLos Angelesbuilding permit$14,000,000 project