Skip to content
General ConstructionLos Angeles International AirportPermit issued

Terminal Modernization at Los Angeles International Airport

380 WORLD WAY, Los Angeles International Airport, 90045

Winston

Sinra's conciergeOnline now

Planning general construction work near Los Angeles International Airport? I’ll scope it, price it, and line up the right pro.

Reported project cost

$14,000,000

As declared on the permit filing. Bldg-Alter/Repair.

Issued
May 22, 2026
Expires
—
License
B

What was permitted

This permit outlines a significant modernization project at the Tom Bradley International Terminal at Los Angeles International Airport. The scope includes selective demolition, structural work like beam relocation, and extensive renovations to finishes, MEP systems, and baggage carousel reconfiguration.

Issued on May 22, 2026, this large-scale project has an estimated cost of $14,000,000. The contractor for this extensive work is Clark / Mccarthy A Joint Venture.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number25016-10000-36592
Work permit #—
Job filing number—
Work typeBldg-Alter/Repair
StatusIssued
Job descriptionMODERNIZATION OF SELECT AREAS AND SYSTEMS AT THE EXISTING TOM BRADLEY INTERNATIONAL TERMINAL AT ARRIVALS LEVEL 1: Selective demolition of partition walls, finishes, ceilings, terrazzo flooring, topping slabs at entry points, restroom lavatories, fixtures, and associated equipment. Structural work includes removal and relocation of one moment frame beam to a higher position on the same frame. Renovations include new topping slabs at ramps, terrazzo flooring, new partitions, ceilings, lighting, MEP systems, and associated fixtures and equipment. The existing baggage carousel will be reconfigured to increase capacity. Accessibility upgrades include new ramps with compliant slopes, equipment mounted at code-required heights, and accessible restroom lavatories. No changes to the path of travel to restrooms, elevators, or exits.
Floor / unit—
Estimated cost$14,000,000
ApprovedDecember 23, 2025
IssuedMay 22, 2026
Expires—
BBL—
BIN—

Related searches

terminal modernizationairport constructionLos Angeles International AirportLos Angelesbuilding permit$14,000,000 project