Terminal Modernization at Los Angeles International Airport
380 WORLD WAY, Los Angeles International Airport, 90045
What was permitted
This permit outlines a significant modernization project at the Tom Bradley International Terminal at Los Angeles International Airport. The scope includes selective demolition, structural work like beam relocation, and extensive renovations to finishes, MEP systems, and baggage carousel reconfiguration.
Issued on May 22, 2026, this large-scale project has an estimated cost of $14,000,000. The contractor for this extensive work is Clark / Mccarthy A Joint Venture.
Major airport infrastructure projects, like the $14 million modernization at LAX, involve complex renovations and structural changes.
What it cost
Issued
May 22, 2026
Expires
—
License
B
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Clark / Mccarthy A Joint Venture · 2 permits across 1 area
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 25016-10000-36592 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Bldg-Alter/Repair |
| Status | Issued |
| Job Description | MODERNIZATION OF SELECT AREAS AND SYSTEMS AT THE EXISTING TOM BRADLEY INTERNATIONAL TERMINAL AT ARRIVALS LEVEL 1: Selective demolition of partition walls, finishes, ceilings, terrazzo flooring, topping slabs at entry points, restroom lavatories, fixtures, and associated equipment. Structural work includes removal and relocation of one moment frame beam to a higher position on the same frame. Renovations include new topping slabs at ramps, terrazzo flooring, new partitions, ceilings, lighting, MEP systems, and associated fixtures and equipment. The existing baggage carousel will be reconfigured to increase capacity. Accessibility upgrades include new ramps with compliant slopes, equipment mounted at code-required heights, and accessible restroom lavatories. No changes to the path of travel to restrooms, elevators, or exits. |
| Floor / Unit | — |
| Estimated Cost | $14,000,000 |
| Approved | December 23, 2025 |
| Issued | May 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |