What was permitted
A significant construction project, the TBIT Refresh - Package #2, Supplemental #1, is underway at Los Angeles International Airport. This phase involves building exterior entry portals on Levels 1 and 3 of the Tom Bradley International Terminal.
This permit, issued on September 10, 2026, has an estimated project cost of $1,600,000 and is for a commercial property. The scope includes architectural and structural work for glazed automatic entry doors.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 25016-10001-36592 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | TBIT Refresh - Package #2, Supplemental #1: This scope of work is part of the overall TBIT Refresh Project (Plan Check #B25LA48817 and #B25LA52462, respectively). The specific scope includes the construction of exterior entry portals at Levels 1 (Arrivals) and 3 (Departures). These portals are entirely at the exterior of the TBIT building, with the exception of portions of the support steel that tie into the existing building structure. Each portal will host a set of glazed automatic entry doors for public access to the terminal. This submittal includes only architectural and structural scope. |
| Floor / unit | — |
| Estimated cost | $1,600,000 |
| Approved | June 11, 2026 |
| Issued | September 10, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches