Skip to content
Accessory Dwelling Unit (ADU) ConstructionNortheast Los AngelesPermit issued

ADU Conversion at 5604-5606 E Hub St, Northeast Los Angeles

5604-5606 E HUB ST, Northeast Los Angeles, 90042

Winston

Sinra's conciergeOnline now

Planning accessory dwelling unit (adu) construction work near Northeast Los Angeles? I’ll scope it, price it, and line up the right pro.

Reported project cost

$48,000

As declared on the permit filing. Bldg-Alter/Repair.

Issued
May 11, 2026
Expires
—
License
—

What was permitted

This permit details the conversion of the rear of an existing single-family dwelling into a 520-square-foot Accessory Dwelling Unit (ADU) in Northeast Los Angeles. Additionally, a kitchen will be added to the remaining portion of the main house.

Issued on May 11, 2026, the estimated project cost for this significant renovation is $48,000. This type of substantial alteration is typical for 1 or 2 Family Dwellings, aiming to increase housing stock.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Northeast Los Angeles, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number26016-10000-07036
Work permit #—
Job filing number—
Work typeBldg-Alter/Repair
StatusIssued
Job descriptionCONVERT REAR OF EXISTING SFD INTO AN ACCESSORY DWELLING UNIT 520SF, ADD KITCHEN TO REMAINING SFD
Floor / unit—
Estimated cost$48,000
ApprovedMarch 16, 2026
IssuedMay 11, 2026
Expires—
BBL—
BIN—

Related searches

ADU conversionNortheast Los AngelesLos Angelesaccessory dwelling unitresidential alterationhome addition$40000-$50000