What was permitted
This permit represents a deferred submittal for the LAX United Cargo Optimization project, focusing on the structural aspects of new racking installations. The work involves new 'Temperature Controlled ULD racking' and 'Empty AKE racking' within the cargo facility.
Issued on August 31, 2026, this project has an estimated cost of $184,538. The submittal includes structural drawings and calculations for the anchorage of the new racking systems. This is a commercial project at the Los Angeles International Airport.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Los Angeles International Airport, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 25016-10002-36833 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Bldg-Alter/Repair |
| Status | Issued |
| Job description | LAX project: This is a deferred submittal for the LAX United Cargo Optimization project (Permit#: 25016-10000-36833). The submittal consists of structural drawings and calculations for new 'Temperature Controlled ULD racking' (TC ULD) and new 'Empty AKE racking' that will be installed as part of the above permitted project. The included reference site plan shows the location of the two different storage racks on site. Anchorage for the new racking is included in the RTI set. |
| Floor / unit | — |
| Estimated cost | $184,538 |
| Approved | July 27, 2026 |
| Issued | August 31, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Related searches